slider_img
projects
Projects

Our planned 5 GW of solar and wind projects will help drive the energy transition in Croatia, Italy, Poland and Romania.

At the moment we have seven projects in flight with two projects live, and five in the development phase.

If you are interested in learning more about our projects, please contact us today. We would be happy to answer any of your questions.

7 current projects

3 IN ROMANIA, 1 IN CROATIA, 3 IN ITALY

2

5

SOLAR POWER PLANT IN GLODENI, ROMANIA, PRODUCING
53

Megawatt generating capacity

19,000

Homes powered

18,000

Tonnes of CO2 reduced annually

WIND POWER PLANT, IASI, ROMANIA, PRODUCING
60

Megawatt generating capacity

39,000

Homes powered

38,000

Tonnes of CO2 reduced annually

SOLAR POWER PLANT IN GLODENI, ROMANIA, IN DEVELOPMENT
60

Megawatt generating capacity

22,400

Homes powered

21,800

Tonnes of CO2 reduced annually

WIND POWER PLANT IN SPLIT-DALMATIA, CROATIA, IN PLANNING
127

Megawatt generating capacity

83,000

Homes powered

51,000

Tonnes of CO2 reduced annually

SOLAR POWER PLANT IN SARDINIA, ITALY IN DEVELOPMENT
250

Megawatt generating capacity

101,400

Homes powered

102,200

Tonnes of CO2 reduced annually

SOLAR POWER PLANT IN MOLISE, ITALY IN DEVELOPMENT
35

Megawatt generating capacity

13,500

Homes powered

13,600

Tonnes of CO2 reduced annually

SOLAR POWER PLANT IN PUGLIA, ITALY IN DEVELOPMENT
57

Megawatt generating capacity

23,000

Homes powered

13,200

Tonnes of CO2 reduced annually

Project Ruginoasa is a 60 MW windfarm located in Iași County in Romania.

Projects

 

Construction commenced in March 2023, and the first of 10 Vestas V162-6.0 MW turbines was erected in July. The windfarm started producing energy in December 2023. The turbines have a diameter of 162m, with a hub height of 125m,Besides the 10 wind turbines, a dedicated 110KV substation  has been installed which connects the project to the existing 110kv overhead line Vatra - Targu Frumos operated by Delgaz Grid.
 
The project is being finance by DTEK Renewables International together with a project finance facility provided by Kommunalkredit Austria AG.
 
Project Ruginoasa is one of the first windfarms constructed in Romania since the ending of the government support scheme in 2013.

Project Glodeni is a 53 MW solar park located in Mures county, in Romania.

Projects

 

The solar park covers a total area of 81 hectares, and consists of 79,772 Risen RSM132-8-665BDMG solar panels mounted on an Ideematec tracker system designed specifically for the site. Construction commenced in March 2023, and the park started producing energy in the beginning of January 2024. Besides the 3 solar fields, a dedicated 110KV substation  has been installed which connects connects the project to the existing 110kv overhead line Ungheni - Reghin2 operated by Distributie Energie Electrica Romania.
 
Project Glodeni is one of the first solar parks constructed in Romania since the ending of the government support scheme in 2013.
 

Waiting...